January 14, 2026

Central Piedmont Community College PSTC is under construction

Phase 1 of the 39-acre, $118M public safety training center is now under construction at Central
Piedmont Community College’s Levine Campus. Teamed with Boomerang and Leo A Daly, Elliott,
LeBoeuf & McElwain contributed to the program and master plan of the new training center and is
designing three training structures. 

Phase 2 is in design to finish the 135,000 sf buildout, which will include:

  1. Academic building
  2.  Indoor tactical shooting range
  3. Multi-zone tactical training neighborhood, including:
    a. Urban block with town square, bank, convenience store, and flexible indoor training
        space that can simulate office, hotel, and hospital.
    b. Urban residential block
    c. Suburban cul-de-sac
  4. Burn neighborhood with 2-story Class A residential burn building and 3 1/2-story Class A
    commercial burn building with walkout basement
  5. 7-story clean tower for fire, EMS, rescue, and law enforcement training
  6. Tech rescue neighborhood
  7. Simulated fire station
  8. 15 acre EVOC
  9. POPAT

Share this post